conductor(plan): Checkpoint end of Phase 1

This commit is contained in:
2026-03-19 19:14:06 -04:00
parent 40395893c5
commit 54cc85b4f3

View File

@@ -1,10 +1,10 @@
# Implementation Plan: Discussion Takes & Timeline Branching
## Phase 1: Backend Support for Timeline Branching
## Phase 1: Backend Support for Timeline Branching [checkpoint: 4039589]
- [x] Task: Write failing tests for extending the session state model to support branching (tree-like history or parallel linear "takes" with a shared ancestor). [fefa06b]
- [x] Task: Implement backend logic to branch a session history at a specific message index into a new take ID. [fefa06b]
- [x] Task: Implement backend logic to promote a specific take ID into an independent, top-level session. [fefa06b]
- [ ] Task: Conductor - User Manual Verification 'Phase 1: Backend Support for Timeline Branching' (Protocol in workflow.md)
- [x] Task: Conductor - User Manual Verification 'Phase 1: Backend Support for Timeline Branching' (Protocol in workflow.md)
## Phase 2: GUI Implementation for Tabbed Takes
- [ ] Task: Write GUI tests verifying the rendering and navigation of multiple tabs for a single session.