conductor(plan): Mark phase 'Test Track Implementation' as complete

This commit is contained in:
2026-02-25 08:55:45 -05:00
parent 4eb4e8667c
commit 3378fc51b3

View File

@@ -12,12 +12,12 @@
- [x] Task: Create a diagnostic test to verify Tier 2 -> Tier 3 delegation flow and context isolation. a3cb12b
- [x] Task: Conductor - User Manual Verification 'Infrastructure Verification' (Protocol in workflow.md) 1edf3a4
## Phase 3: Test Track Implementation
## Phase 3: Test Track Implementation [checkpoint: 4eb4e86]
- [x] Task: Scaffold the `mma_verification_mock` test track directory and metadata. 52656
- [x] Task: Draft `spec.md` and `plan.md` for the mock track, explicitly including tiered delegation steps. a8d7c2e
- [x] Task: Execute the mock track using `/conductor:implement` (simulated or real). b1c2d3e
- [x] Task: Verify the requirement "Tier 3 can spawn Tier 4" within the mock track's implementation flow. f4g5h6i
- [~] Task: Conductor - User Manual Verification 'Test Track Implementation' (Protocol in workflow.md)
- [x] Task: Conductor - User Manual Verification 'Test Track Implementation' (Protocol in workflow.md) 4eb4e86
## Phase 4: Final Validation and Reporting
- [ ] Task: Run the full suite of automated verification tests for the tiered architecture.