conductor(plan): Mark task 'Final project-wide link validation and documentation update' as in-progress

This commit is contained in:
2026-02-24 20:51:48 -05:00
parent d4d6e5b9ff
commit 2f5cfb2fca

View File

@@ -34,7 +34,7 @@ Finalize the migration and decommission the original `gui.py`.
- [x] Task: Rename gui.py to gui_legacy.py. [c4c47b8] - [x] Task: Rename gui.py to gui_legacy.py. [c4c47b8]
- [x] Task: Update project entry point or documentation to point to `gui_2.py` as the primary interface. [b92fa90] - [x] Task: Update project entry point or documentation to point to `gui_2.py` as the primary interface. [b92fa90]
- [ ] Task: Final project-wide link validation and documentation update. - [~] Task: Final project-wide link validation and documentation update.
- [ ] Task: Conductor - User Manual Verification 'Phase 4: Deprecation and Cleanup' (Protocol in workflow.md) - [ ] Task: Conductor - User Manual Verification 'Phase 4: Deprecation and Cleanup' (Protocol in workflow.md)
--- ---
[checkpoint: (SHA will be recorded here)] [checkpoint: (SHA will be recorded here)]