conductor(plan): Mark Phase 4 of Tool Bias Tuning as complete

This commit is contained in:
2026-03-10 10:25:25 -04:00
parent 85ae4094cb
commit 24a4051271

View File

@@ -33,9 +33,9 @@
- [x] Task: Write integration tests for the new UI data flow. 1c83b3e - [x] Task: Write integration tests for the new UI data flow. 1c83b3e
- [x] Task: Conductor - User Manual Verification 'Phase 3: GUI Integration' (Protocol in workflow.md) 1c83b3e - [x] Task: Conductor - User Manual Verification 'Phase 3: GUI Integration' (Protocol in workflow.md) 1c83b3e
## Phase 4: Verification & Final Polish ## Phase 4: Verification & Final Polish [checkpoint: 85ae409]
- [ ] Task: Create a Bias Efficacy Simulation. - [x] Task: Create a Bias Efficacy Simulation. 85ae409
- [ ] Implement a specialized simulation test where two tools could solve a problem, and verify the agent chooses the one with higher weight. - [x] Implement a specialized simulation test where two tools could solve a problem, and verify the agent chooses the one with higher weight. 85ae409
- [ ] Task: Final UI polish (spacing, icons, tooltips explaining the bias system). - [x] Task: Final UI polish (spacing, icons, tooltips explaining the bias system). 85ae409
- [ ] Task: Run full suite of relevant tests. - [x] Task: Run full suite of relevant tests. 85ae409
- [ ] Task: Conductor - User Manual Verification 'Phase 4: Verification & Polish' (Protocol in workflow.md) - [x] Task: Conductor - User Manual Verification 'Phase 4: Verification & Polish' (Protocol in workflow.md) 85ae409