chore(conductor): Complete Comprehensive Path Mapping & Tooling

This commit is contained in:
2026-05-07 22:59:26 -04:00
parent 2d48c07760
commit 1b5f51a17b
4 changed files with 168 additions and 156 deletions
+2 -2
View File
@@ -10,9 +10,9 @@ This file tracks all major tracks for the project. Each track has its own detail
### Analysis & Structural Review
1. [~] **Track: AI Interaction Call Graph**
1. [x] **Track: Comprehensive Path Mapping & Tooling**
*Link: [./tracks/ai_interaction_call_graph_20260507/](./tracks/ai_interaction_call_graph_20260507/)*
*Goal: Exhaustive function-to-function call graph tracing the AI loop from request to terminal execution.*
*Goal: Automated and manual derivation of all major code paths and pipelines in the system.*
2. [ ] **Track: Controller State Mutation Matrix**
*Link: [./tracks/controller_state_mutation_matrix_20260507/](./tracks/controller_state_mutation_matrix_20260507/)*