conductor(plan): Mark phase 'Phase 1: Research and Layout Audit' as complete

This commit is contained in:
2026-03-11 19:52:48 -04:00
parent db1f74997c
commit 1a01e3f112

View File

@@ -2,10 +2,10 @@
This plan focuses on enhancing the layout, scaling, and control ergonomics of the Preset windows and AI Settings panel. This plan focuses on enhancing the layout, scaling, and control ergonomics of the Preset windows and AI Settings panel.
## Phase 1: Research and Layout Audit ## Phase 1: Research and Layout Audit [checkpoint: db1f749]
- [ ] Task: Audit `src/gui_2.py` and `src/app_controller.py` for current window resizing and scaling logic. - [x] Task: Audit `src/gui_2.py` and `src/app_controller.py` for current window resizing and scaling logic. db1f749
- [ ] Task: Identify specific UI sections in `Personas`, `Prompts`, `Tools`, and `AI Settings` windows that require padding and width adjustments. - [x] Task: Identify specific UI sections in `Personas`, `Prompts`, `Tools`, and `AI Settings` windows that require padding and width adjustments. db1f749
- [ ] Task: Conductor - User Manual Verification 'Phase 1: Research and Layout Audit' (Protocol in workflow.md) - [x] Task: Conductor - User Manual Verification 'Phase 1: Research and Layout Audit' (Protocol in workflow.md) db1f749
## Phase 2: Preset Windows Layout & Scaling ## Phase 2: Preset Windows Layout & Scaling
- [ ] Task: Write tests to verify window layout stability and element visibility during simulated resizes. - [ ] Task: Write tests to verify window layout stability and element visibility during simulated resizes.