# Track Specification: Track Progress Visualization (track_progress_viz_20260306)
|
||||
|
||||
## Overview
|
||||
Progress bars and percentage completion for active tracks and tickets.
|
||||
Progress bars and percentage completion for active tracks and tickets. Better visualization of DAG execution state.
|
||||
|
||||
## Current State Audit
|
||||
|
||||
### Already Implemented
|
||||
- **`models.Track`**: Has tickets list
|
||||
- **`project_manager.get_all_tracks()`**: Returns track progress
|
||||
- **GUI**: Shows ticket status but no progress bar
|
||||
### Already Implemented (DO NOT re-implement)
|
||||
|
||||
### Gaps to Fill
|
||||
- No visual progress bar
|
||||
#### Track Model (src/models.py)
|
||||
- **`Track` dataclass**: Has `tickets: list[Ticket]` field
|
||||
- **`Ticket.status`**: "todo" | "in_progress" | "completed" | "blocked"
|
||||
|
||||
#### Track Listing (src/project_manager.py)
|
||||
- **`get_all_tracks()`**: Returns list of track metadata with progress
|
||||
- **Progress calculation exists**: Counts completed vs total tickets
|
||||
|
||||
#### DAG Engine (src/dag_engine.py)
|
||||
- **`TrackDAG`**: Manages ticket dependency graph
|
||||
- **Status tracking via `update_task_status()`**
|
||||
|
||||
### Gaps to Fill (This Track's Scope)
|
||||
- No visual progress bar in GUI
|
||||
- No percentage completion display
|
||||
- No ETA estimation
|
||||
- No ticket breakdown display
|
||||
|
||||
## Architectural Constraints
|
||||
|
||||
### Accurate State
|
||||
- Progress MUST reflect actual ticket status
|
||||
- Count completed, in_progress, blocked, todo separately
|
||||
|
||||
### Efficient Updates
|
||||
- Status changes trigger immediate UI update
|
||||
- No polling - event-driven via MMA state updates
|
||||
|
||||
## Architecture Reference
|
||||
|
||||
### Key Integration Points
|
||||
|
||||
| File | Lines | Purpose |
|
||||
|------|-------|---------|
|
||||
| `src/gui_2.py` | 2650-2750 | MMA Dashboard - add progress display |
|
||||
| `src/project_manager.py` | 289-320 | `get_all_tracks()` - progress data |
|
||||
| `src/dag_engine.py` | 50-80 | Status tracking |
|
||||
|
||||
### Progress Calculation
|
||||
```python
|
||||
def calculate_progress(tickets: list[Ticket]) -> dict:
|
||||
total = len(tickets)
|
||||
completed = sum(1 for t in tickets if t.status == "completed")
|
||||
in_progress = sum(1 for t in tickets if t.status == "in_progress")
|
||||
blocked = sum(1 for t in tickets if t.status == "blocked")
|
||||
todo = sum(1 for t in tickets if t.status == "todo")
|
||||
percentage = (completed / total * 100) if total > 0 else 0
|
||||
return {
|
||||
"total": total, "completed": completed, "in_progress": in_progress,
|
||||
"blocked": blocked, "todo": todo, "percentage": percentage
|
||||
}
|
||||
```
|
||||
|
||||
## Functional Requirements
|
||||
- Progress bar showing % complete
|
||||
- Ticket count: X/Y completed
|
||||
- ETA estimation based on average time per ticket
|
||||
|
||||
## Key Integration Points
|
||||
| File | Purpose |
|
||||
|-----|---------|
|
||||
| `src/gui_2.py` | Progress bar rendering |
|
||||
| `src/dag_engine.py` | Completion calculation |
|
||||
### FR1: Progress Bar
|
||||
- Visual progress bar using `imgui.progress_bar()`
|
||||
- Show 0-100% completion
|
||||
- Color based on progress (red < 25%, yellow < 75%, green >= 75%)
|
||||
|
||||
### FR2: Percentage Text
|
||||
- Display "X% complete" below bar
|
||||
- Show "X/Y tickets completed"
|
||||
|
||||
### FR3: Ticket Breakdown
|
||||
- Show counts: completed, in_progress, blocked, todo
|
||||
- Use colored indicators per status
|
||||
|
||||
### FR4: ETA Estimation
|
||||
- Track average time per completed ticket
|
||||
- Estimate remaining time: `avg_time * remaining_tickets`
|
||||
- Display as "ETA: ~Xm"
|
||||
|
||||
## Non-Functional Requirements
|
||||
|
||||
| Requirement | Constraint |
|
||||
|-------------|------------|
|
||||
| Update Latency | <100ms after status change |
|
||||
| Memory | <100 bytes for ETA state |
|
||||
|
||||
## Testing Requirements
|
||||
|
||||
### Unit Tests
|
||||
- Test progress calculation accuracy
|
||||
- Test ETA estimation logic
|
||||
|
||||
### Integration Tests
|
||||
- Complete tickets, verify progress updates
|
||||
- Verify ETA recalculates
|
||||
|
||||
## Out of Scope
|
||||
- Historical progress tracking
|
||||
- Progress export
|
||||
- Multi-track comparison
|
||||
|
||||
## Acceptance Criteria
|
||||
- [ ] Progress bar renders
|
||||
- [ ] Percentage accurate
|
||||
- [ ] Counts match actual tickets
|
||||
- [ ] ETA calculation works
|
||||
- [ ] 1-space indentation
|
||||
- [ ] Progress bar renders correctly
|
||||
- [ ] Percentage accurate (X/Y completed)
|
||||
- [ ] Ticket breakdown displayed
|
||||
- [ ] ETA estimation works
|
||||
- [ ] Updates on ticket status change
|
||||
- [ ] 1-space indentation maintained
|
||||
|
||||