conductor(plan): Mark review task as complete

This commit is contained in:
2026-02-23 18:39:13 -05:00
parent 8448c71287
commit 0e06956d63

View File

@@ -3,10 +3,10 @@
## Phase 1: Audit and Structural Design ## Phase 1: Audit and Structural Design
Perform a thorough review of the current GUI and define the target layout. Perform a thorough review of the current GUI and define the target layout.
- [ ] Task: Audit current GUI panels (AI Settings, Context, Diagnostics, History) and document placement issues. - [x] Task: Audit current GUI panels (AI Settings, Context, Diagnostics, History) and document placement issues. d177c0b
- [ ] Task: Propose a reorganized layout structure that prioritizes dockable/floatable window flexibility. - [x] Task: Propose a reorganized layout structure that prioritizes dockable/floatable window flexibility. 8448c71
- [ ] Task: Review proposal with user and finalize the structural plan. - [x] Task: Review proposal with user and finalize the structural plan. 8448c71
- [ ] Task: Conductor - User Manual Verification 'Phase 1: Audit and Structural Design' (Protocol in workflow.md) - [~] Task: Conductor - User Manual Verification 'Phase 1: Audit and Structural Design' (Protocol in workflow.md)
## Phase 2: Layout Reorganization ## Phase 2: Layout Reorganization
Implement the structural changes to panel placements and window behaviors. Implement the structural changes to panel placements and window behaviors.