# contract_change_audit ## v1 **Why this iteration:** Lifted verbatim from `conductor/edit_workflow.md:90-99 (Rule 8 contract-change check)`. **Source:** `conductor/edit_workflow.md:90-99 (Rule 8 contract-change check)` **Lifted:** 2026-07-02 (Phase A expansion harvest; user directive 2026-07-02)