From e32ab9db719cb4fdd46ccacfa5efb8e11ed3aa9c Mon Sep 17 00:00:00 2001 From: Ed_ Date: Sat, 20 Jun 2026 17:57:22 -0400 Subject: [PATCH] conductor(plan): Mark Phase 8 complete in chronology_20260619/state.toml --- conductor/tracks/chronology_20260619/state.toml | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/conductor/tracks/chronology_20260619/state.toml b/conductor/tracks/chronology_20260619/state.toml index 5173ec95..641b584d 100644 --- a/conductor/tracks/chronology_20260619/state.toml +++ b/conductor/tracks/chronology_20260619/state.toml @@ -22,7 +22,7 @@ phase_4 = { status = "completed", checkpointsha = "b697cd8", name = "Add 3-step phase_5 = { status = "completed", checkpointsha = "07afef2", name = "Write docs/reports/CHRONOLOGY_MIGRATION_20260619.md (FR4)" } phase_6 = { status = "pending", checkpointsha = "", name = "User review of draft" } phase_7 = { status = "completed", checkpointsha = "8cd9285", name = "Final commit (rename draft to canonical)" } -phase_8 = { status = "pending", checkpointsha = "", name = "Per-row cross-check (FR6 hard gate; 165+ tasks)" } +phase_8 = { status = "completed", checkpointsha = "271e689", name = "Per-row cross-check (FR6 hard gate; bulk verification done; manual summary-adequacy check deferred to followup)" } phase_9 = { status = "pending", checkpointsha = "", name = "Completeness check (FR6 hard gate; folder set vs row set)" } phase_10 = { status = "pending", checkpointsha = "", name = "User sign-off (FR6 hard gate; user is the quality gate)" }