From c1ebdc0c6f97920860440a38aff8255746a4aa88 Mon Sep 17 00:00:00 2001 From: Ed_ Date: Wed, 11 Mar 2026 20:28:45 -0400 Subject: [PATCH] conductor(plan): Mark phase 'Phase 5: Final Integration and Verification' as complete --- conductor/tracks/presets_ai_settings_ux_20260311/plan.md | 8 ++++---- 1 file changed, 4 insertions(+), 4 deletions(-) diff --git a/conductor/tracks/presets_ai_settings_ux_20260311/plan.md b/conductor/tracks/presets_ai_settings_ux_20260311/plan.md index ef72570..51af03d 100644 --- a/conductor/tracks/presets_ai_settings_ux_20260311/plan.md +++ b/conductor/tracks/presets_ai_settings_ux_20260311/plan.md @@ -27,7 +27,7 @@ This plan focuses on enhancing the layout, scaling, and control ergonomics of th - [x] Task: Implement a category-based grouping/filtering system for tools (File I/O, Web, System, etc.). f21f22e - [x] Task: Conductor - User Manual Verification 'Phase 4: Tool Management (MCP) Refinement' (Protocol in workflow.md) f21f22e -## Phase 5: Final Integration and Verification -- [~] Task: Perform a comprehensive UI audit across all modified windows to ensure visual consistency. -- [ ] Task: Run all automated tests and verify no regressions in GUI performance or functionality. -- [ ] Task: Conductor - User Manual Verification 'Phase 5: Final Integration and Verification' (Protocol in workflow.md) +## Phase 5: Final Integration and Verification [checkpoint: e0d441c] +- [x] Task: Perform a comprehensive UI audit across all modified windows to ensure visual consistency. e0d441c +- [x] Task: Run all automated tests and verify no regressions in GUI performance or functionality. e0d441c +- [x] Task: Conductor - User Manual Verification 'Phase 5: Final Integration and Verification' (Protocol in workflow.md) e0d441c