From ba97ccda3c605076c8bfb48549a1783b1211d9c3 Mon Sep 17 00:00:00 2001 From: Ed_ Date: Mon, 23 Feb 2026 19:28:31 -0500 Subject: [PATCH] conductor(plan): Mark Phase 3 as complete --- conductor/tracks/live_ux_test_20260223/plan.md | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-) diff --git a/conductor/tracks/live_ux_test_20260223/plan.md b/conductor/tracks/live_ux_test_20260223/plan.md index fca8e1b..6a2ff93 100644 --- a/conductor/tracks/live_ux_test_20260223/plan.md +++ b/conductor/tracks/live_ux_test_20260223/plan.md @@ -18,14 +18,14 @@ Build the core interaction loop for project creation and AI discussion. - [x] Task: Implement 'Thinking' and 'Live' indicator verification logic. 6d16438 - [x] Task: Conductor - User Manual Verification 'Phase 2: Workflow Simulation' (Protocol in workflow.md) 9c4a72c -## Phase 3: History & Session Verification +## Phase 3: History & Session Verification [checkpoint: 0f04e06] Simulate complex session management and historical audit features. - [x] Task: Implement discussion switching logic (creating/switching between named discussions). 5e1b965 - [x] Task: Implement 'Load Prior Log' simulation and 'Tinted Mode' detection. 5e1b965 - [x] Task: Write Tests (Verify log loading and tab navigation consistency) 5e1b965 - [x] Task: Implement truncation limit verification (forcing a long history and checking bleed). 5e1b965 -- [ ] Task: Conductor - User Manual Verification 'Phase 3: History & Session Verification' (Protocol in workflow.md) +- [x] Task: Conductor - User Manual Verification 'Phase 3: History & Session Verification' (Protocol in workflow.md) 0f04e06 ## Phase 4: Final Integration & Regression Consolidate the simulation into end-user artifacts and CI tests.