From 0be1c1259b021bdef42b58a66dfbfe3e2c9df720 Mon Sep 17 00:00:00 2001 From: Ed_ Date: Thu, 14 May 2026 23:38:51 -0400 Subject: [PATCH] conductor(plan): Mark Phase 4 and Phase 2 as complete --- conductor/tracks/fix_test_suite_failures_20260514/plan.md | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-) diff --git a/conductor/tracks/fix_test_suite_failures_20260514/plan.md b/conductor/tracks/fix_test_suite_failures_20260514/plan.md index 857e04c..d65983d 100644 --- a/conductor/tracks/fix_test_suite_failures_20260514/plan.md +++ b/conductor/tracks/fix_test_suite_failures_20260514/plan.md @@ -24,5 +24,5 @@ - [x] Task: Conductor - User Manual Verification 'Phase 3: MMA, Workflow, and Negative Flow Tests' (Protocol in workflow.md) ## Phase 4: Remaining Batched Failures -- [ ] Task: Run the test suite and verify if any remaining files from the 45 failed batches still have underlying issues not covered above. -- [ ] Task: Conductor - User Manual Verification 'Phase 4: Remaining Batched Failures' (Protocol in workflow.md) \ No newline at end of file +- [x] Task: Run the test suite and verify if any remaining files from the 45 failed batches still have underlying issues not covered above. 45104af +- [x] Task: Conductor - User Manual Verification 'Phase 4: Remaining Batched Failures' (Protocol in workflow.md) \ No newline at end of file