From 064cb26b385dd1b5610affa65e857331798d4e6c Mon Sep 17 00:00:00 2001 From: Ed_ Date: Thu, 11 Jun 2026 09:34:24 -0400 Subject: [PATCH] conductor(checkpoint): Phase 6 - docs done, track active with follow-up (NO ARCHIVE) Phase 6 of qwen_llama_grok_integration_20260606 ships the docs. 4 of 5 state tasks done (t6.3 CANCELLED per user directive: 'we can then doc this we're not archiving yet, if we have a follow up track I need this one to stay up because there is still alot todo'). What shipped: - t6.1: docs/guide_ai_client.md updated - Overview mentions 8 providers (was 5) - New 'Shared OpenAI-Compatible Helper' section: NormalizedResponse, OpenAICompatibleRequest, send_openai_compatible, usage pattern - Documents the Qwen adapter (src/qwen_adapter.py) and Llama multi-backend state (3 backends; _get_llama_cost_tracking) - Tests: 9 total (3 capabilities + 6 openai_compatible) - t6.2: docs/guide_models.md updated - PROVIDERS list: 5 -> 8 entries - t6.4: conductor/tracks.md updated - Status note on the qwen track entry: 50/79 tasks done; Phase 6 in progress; NOT archiving; points to the follow-up - t6.5: this checkpoint (active-with-follow-up, not archived) - CANCELLED: t6.3 (no git mv to archive) - CANCELLED: t6.4 'Recently Completed' move (track is active) What was created in addition (not in the original Phase 6 plan): - docs/reports/qwen_llama_grok_followup_audit_20260611.md - Audit report explaining why a follow-up is needed - 7 categories of gaps from the parent track - The Tech Lead's 'footnote for now' failure mode (lessons learned) - conductor/tracks/qwen_llama_grok_followup_20260611/ - 5-phase follow-up track: tool loop lift, PROVIDERS move, UX adaptations 2-9, local-first + matrix v2, Anthropic/Gemini/DeepSeek migration - spec.md, state.toml, metadata.json, TODO.md - Local-model-first priority per user feedback - Wait for parent's Phase 6 to finish before starting (blocked_by) Verification: - 38/38 regression tests pass in batch - No new audit script violations - 4 new files in follow-up track: spec.md, state.toml, metadata.json, TODO.md - 1 new report: docs/reports/qwen_llama_grok_followup_audit_20260611.md - 2 docs files updated: guide_ai_client.md, guide_models.md The parent track remains ACTIVE (not archived) for the follow-up to use as a reference. Per the user's 'there is still alot todo'.